Civil Quality Control Log

Concrete Curing Monitor

Project: VIP Road Duplex Casing | Structural Shell Execution

Site Inspector Sign-Off
Vikky Sharma
Approved & IS Code Verified
Structural Member
1st Floor Slab Deck
Concrete Design Mix
M25 Grade
Cement Brand
ACC Gold OPC 53
Casting Date
May 10, 2026
Wet Curing Target
14 Days (IS 456)
Day Curing Date Avg Temp (°C) Moisture Level Ponding Depth Status / Sign-off
Day 01 May 11, 2026 38.4°C 100% (High Saturation) 40 mm Verified (VS)
Day 02 May 12, 2026 39.1°C 98% (Saturated) 38 mm Verified (VS)
Day 03 May 13, 2026 38.7°C 99% (Saturated) 40 mm Verified (VS)
Day 04 May 14, 2026 40.2°C 97% (Re-watered) 42 mm Verified (VS)
Day 05 May 15, 2026 39.5°C 99% (Saturated) 38 mm Verified (VS)
Day 06 May 16, 2026 37.8°C 99% (Saturated) 40 mm Verified (VS)
Day 07 May 17, 2026 38.2°C 100% (Mid-term Check) 40 mm Verified (VS)
Day 08 May 18, 2026 39.0°C 98% (Saturated) 35 mm Verified (VS)
Day 09 May 19, 2026 40.5°C 96% (Re-watered) 42 mm Verified (VS)
Day 10 May 20, 2026 39.8°C 98% (Saturated) 38 mm Verified (VS)
Day 11 May 21, 2026 38.9°C 99% (Saturated) 40 mm Verified (VS)
Day 12 May 22, 2026 37.5°C 100% (Saturated) 40 mm Verified (VS)
Day 13 May 23, 2026 38.1°C 99% (Saturated) 38 mm Verified (VS)
Day 14 May 24, 2026 39.2°C 100% (Final Wetting) 35 mm Verified (VS)