Structural Member
1st Floor Slab Deck
Concrete Design Mix
M25 Grade
Cement Brand
ACC Gold OPC 53
Casting Date
May 10, 2026
Wet Curing Target
14 Days (IS 456)
| Day |
Curing Date |
Avg Temp (°C) |
Moisture Level |
Ponding Depth |
Status / Sign-off |
| Day 01 |
May 11, 2026 |
38.4°C |
100% (High Saturation) |
40 mm |
Verified (VS) |
| Day 02 |
May 12, 2026 |
39.1°C |
98% (Saturated) |
38 mm |
Verified (VS) |
| Day 03 |
May 13, 2026 |
38.7°C |
99% (Saturated) |
40 mm |
Verified (VS) |
| Day 04 |
May 14, 2026 |
40.2°C |
97% (Re-watered) |
42 mm |
Verified (VS) |
| Day 05 |
May 15, 2026 |
39.5°C |
99% (Saturated) |
38 mm |
Verified (VS) |
| Day 06 |
May 16, 2026 |
37.8°C |
99% (Saturated) |
40 mm |
Verified (VS) |
| Day 07 |
May 17, 2026 |
38.2°C |
100% (Mid-term Check) |
40 mm |
Verified (VS) |
| Day 08 |
May 18, 2026 |
39.0°C |
98% (Saturated) |
35 mm |
Verified (VS) |
| Day 09 |
May 19, 2026 |
40.5°C |
96% (Re-watered) |
42 mm |
Verified (VS) |
| Day 10 |
May 20, 2026 |
39.8°C |
98% (Saturated) |
38 mm |
Verified (VS) |
| Day 11 |
May 21, 2026 |
38.9°C |
99% (Saturated) |
40 mm |
Verified (VS) |
| Day 12 |
May 22, 2026 |
37.5°C |
100% (Saturated) |
40 mm |
Verified (VS) |
| Day 13 |
May 23, 2026 |
38.1°C |
99% (Saturated) |
38 mm |
Verified (VS) |
| Day 14 |
May 24, 2026 |
39.2°C |
100% (Final Wetting) |
35 mm |
Verified (VS) |